Skip to content
CAMPO

Bathroom Refurbishment — Croydon

Victorian Bathroom Refurbishment

Complete strip-out and refurbishment of a tired period bathroom: new layout, full tiling and finishing.

Project overview

Complete strip-out and refurbishment of a tired period bathroom: new layout, full tiling and finishing.

The challenge

The original bathroom had not been touched in decades: a dated suite, cracked tiles around the bath, poor waterproofing and plaster in poor condition on the external wall.

The work

  1. 01Full strip-out of the old suite, tiles and flooring
  2. 02Surface repairs and plastering where required
  3. 03Full room retiling — walls and floor — with waterproofing in the shower zone
  4. 04Installation of the new suite, brassware and shower
  5. 05Ceiling and woodwork repainting, silicone finishing

Before & after

Drag the slider — or use the arrow keys — to compare.

Refurbished bathroom after completion: new suite, fully tiled walls and floorDated bathroom before refurbishment: old suite, cracked tiles and worn finishes

Services provided

The result

A fully functional, waterproof bathroom finished to a modern standard, ready for the family to use.

Planning something similar?

Tell us about your project — we will tell you which trades are involved and how the work would be organised.

Get a Free Quote